WATER

PROJECT ACHIEVEMENTS JAN 2000-DEC 2024

WATER
  • Excavated and built Kathiani earth dam in the Scheme yr 2009

  • Excavated and built Ikithathi earth dam in Makima yr 2014

  • Excavated and built Kalisa earth dam in the Scheme yr 2015

  • Excavated and built Mulukusi earth dam in the Scheme yr 2016

  • Provided 10,000 litre PVC rain tanks and roof gutters (on cost sharing basis) to churches and other institutions as follows:-

Kaseve ACK Church yr 2010

Mbonzuki dispensary yr 2012

Kaseve SA Church yr 2015

Mbonzuki SA Church yr 2016

Mbonzuki SA Church yr 2016

Karaba CCM Church yr 2016

Nthingini AIC Church yr 2016

Mbonzuki ACK Church yr 2018

Maviani AIC Church yr 2018

Karaba SA Church yr 2018

Church CCI Gategi yr 2018

Kalisa CCM Church yr 2019

Kikumini SA Church yr 2019

Malikini ACK Church yr 2019

Maviani CCM Church yr 2020

Kaseve AIC Church yr 2021

Emmanuel Exaltation Church yr 2021

Kamwiyendei CCM Church yr 2021

Mbonzuki SA Church yr 2021

Kakindu ACK Church yr 2022

Kamwiyendei CCM Church yr 2023

Musingini CCM yr 2023

Gategi Salvation Army Church yr 2023

Musingini St Barnabas ACK Church yr 2024

Kathiiani Salvation Army Church yr 2024

Foot and Bodaboda Bridges

(for pedestrians & motorbikes)

  • Constructed 10 metres bridge across Kalungulu stream – 2014

  • Constructed 10 metres Kakindu foot and bodaboda bridge across Kakindu stream 2014, reconstructed and extended to 20 metres in 2015, reconstructed and extended to 73 metres in 2021 (due to rising water levels)

  • Constructed 30 metres bridge across Ntheeuni stream - yr 2016

  • Reinforcement of the concrete pillars for Kakindu & Ntheeuni bridge yr 2018

  • Constructed 17 metres bridge across Kithunguthya seasonal stream yr 2019

  • Constructed  a 95 metres foot/boda boda bridge across Ntheeuni Seasonal Stream yr 2024

Boreholes

  • Drilled 80 metres deep borehole at Mbonzuki for Katulye Women’s Group yr 2002 (failed)

  • Supplied equipment for a borehole at Lulwa in the Scheme, but was blocked by stones so could not proceed yr 2006

  • Contributed Kshs 21,000 towards renovation of Plan International borehole at Mbonzuki

  • Ntheeuni borehole , reinforced one bank of the stream, removed broken internal mechanisms in yr 2018, prior to proposed electric powered renovation by Embu County Government for yr 2019 ( renovation did not take place as anticipated so the borehole has failed)

  • Kaseve borehole, supplied and installed new pumping unit yr 2020

  • Supplied and installed motherboard for solar powered borehole at Kathiiani and replaced broken pipes yr 2020

  • Mitigated Mbonzuki borehole by purchasing water pump, tank stand, piping and constructing a watering point yr 2023
  • Reservicing of Ngunyumu Borehole yr 2024